Skip to content
Monday – Friday: 7 a.m. – 5 p.m.Electrical Contractor, Class I · GA Lic. 000000VerifyGeneral liability and workers' compensation insurance · Insurer named on the certificate
1 more license
  • Electrical Contractor, Class I · GA Lic. 000000Verify
  • General liability and workers' compensation insurance · Insurer named on the certificate
(404) 555-0102

What we do

Charging work for commercial sites

One crew from the survey to the energizing, so nothing falls between the utility and the install.

  • Site survey and load study

    We walk the site, read the service and size the charging to your vehicles before any bid.

    How a job runs
  • Utility coordination

    We prepare and file the service request, follow it, and agree the trench route and dates with the utility's crew.

    The utility's part
  • Level 2 charging

    Pedestal and wall units for vehicles that sit for hours: fleets overnight, staff all day and visitors.

  • DC fast charging

    For vehicles that turn around quickly. It needs a large service, so the load study and the utility come first.

  • Panels and service upgrades

    New panels, subpanels and switchgear where the existing service can't carry the chargers.

  • Load management and service

    Controls that share power between chargers, and service calls on the installs we built.

Chargers and networks

We install the hardware that fits your vehicles

We don't sell a charger line. We tell you in the bid what each unit does, how it connects to a network and who supports it.

Support for the hardware comes from its maker. The bid says what we stand behind on the electrical work.

What the bid says about each charger

  • Connector type and power level

  • Network and software, if any

  • Who supports the unit after install

A white charging post with the plug handle seated in a car, another car parked behind

About the work

Do you do DC fast charging?

Where the site's service and the utility allow it. DC fast chargers draw a lot of power, so we check the service and the utility's lead time at the survey before we recommend one.

Do you maintain chargers you didn't install?

Ask us. We look at the unit, the network and the electrical feed on a visit before we agree to service a charger someone else put in.

Do you handle trenching and concrete?

We trench and bore for our conduit and set the pads. Paving, striping and signs we coordinate with your contractor or bring in our own, and the bid says which.

Tell us about the site.

Send the address and the vehicles. We'll set a time to walk it.